Your internet browser has disabled JavaScript.
Website only work when it enable.
To see how to enable JavaScript, Please
click here
!
Document searching
Customer feedback
English
Tiếng Việt
EN
VI
Sign In
Toggle navigation
About us
Introduction
Member companies
Implementation capacity
Quality Policy
Activities
Testing And Commissioning Of Substations Up To 500KV
Power System Automation
Testing And Commissioning The Technological Equipments In Thermal-Hydro Power Plant
Verification Of Measuring Equipments, Calibration Of Electrical-Thermal Equipments And Technical Management Of Power Measurement System
Type Test And Advanced Test For Transformers, Electrical Wire And Cable, Lightning Arresters
Energy Audit, Industrial Boiler Efficiency Testing
Projects
News
Contact
SEARCHING DOCUMENTS
Govement Documents
EVN Documents
Internal Documents
Document code
Date issued
Category
Category
Govement Document
EVN Document
Internal Document
EVN yêu cầu các đơn vị chủ động ứng phó với áp thấp nhiệt đới gần bờ
Công điện EVN chỉ đạo các đơn vị ứng phó cơn bão số 3
Công điện của EVN về đối phó với cơn bão số 1 (Bão MIRINAE)
Công điện của EVN về đối phó với cơn bão Hagupit
Điện của EVN về cơn bão số 4
Điện hỏa tốc của EVN về cơn bão số 3
0961.606.461
0961.606.461
Gửi tin nhắn FB
You did not use the site,
Click here to remain logged
. Timeout:
60
second