Testing And Commissioning Of Substations Up To 500KV

Testing And Commissioning Of Substations Up To 500KV

Northern Electrical Testing Company is the leading unit in testing and commissioning not only in the North but also in all Vietnam. Our company is always the first choice of custormer inside and outside the power industry. NPCETC has been conducting directly testing and commissioning, ... for the electrical equipment system of almost substations up to 500kV in the North before connecting to the National grid or after renovation, overhaul, repair, upgrade, expansion ...to keep the operation safe, reliable and stable.

linh vuc 2

Power System Automation

NPCETC’s strategy and target: By 2020, the science and information technology application level of our employees on power grid automation will become indus- try-leading. The NPCETC determines and considers the applications of science and technology from the fourth industrial revolution as one of the most important motivations for development. Therefore, over the past few years, NPCETC has step by step completed and mastered DCS, SCADA / EMS / DMS, intelligent counting system... in adjusting power grid and power plant system.

Testing And Commissioning The Technological Equipments In Thermal-Hydro Power Plant

Testing And Commissioning The Technological Equipments In Thermal-Hydro Power Plant

This important task helps plants to assess and control equipment systems before putting into operation in order to: connect to the national power grid safely and on schedule, increase efficiency and ensure the operation of equipment system safe-quality-efficient, improve technical economic citerions criterion, reduce expenses and electricity production cost, and minimize incidents during operation.

Verification Of Measuring Equipments, Calibration Of Electrical-Thermal Equipments And Technical Management Of Power Measurement System

Verification Of Measuring Equipments, Calibration Of Electrical-Thermal Equipments And Technical Management Of Power Measurement System

Verification of measuring equipments, calibration of electrical - thermal equipments and technical management of power measurement system are important tasks which evaluate and confirm technical characteristics and parameters of electrical and thermal equipments to ensure the accurate, safe and reliable operation of the equipments and the system. Include the following tasks:

Type Test And Advanced Test For Transformers, Electrical Wire And Cable, Lightning Arresters

Type Test And Advanced Test For Transformers, Electrical Wire And Cable, Lightning Arresters

They are significant tasks which help the investor assess and control the quality of transformer,electrical wire and cable, lightning arrester... to minimize power loss as well as incidents which may occur during operation.

Energy Audit, Industrial Boiler Efficiency Testing

Energy Audit, Industrial Boiler Efficiency Testing

Implementing energy policies of country including the Law on economical and efficient use of energy in 2010, Northern Electrical Testing Company NPCETC is the leading unit in energy audit and industrial boiler efficiency testing to limit outdated technologies which consume more energy, to help businesses produce in a cleaner and more sustainable way, and to reduce energy costs in production and product price.